Vesgantti 97" Modular Sectional Sofa Green, U-Shaped Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

Vesgantti 97" Modular Sectional Sofa Green, U-Shaped Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

$911.98 USD
Skip to product information
Vesgantti 97" Modular Sectional Sofa Green, U-Shaped Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

Vesgantti 97" Modular Sectional Sofa Green, U-Shaped Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment

$911.98 USD
Shipping calculated at checkout.

About This

  • Modular Sectional Sofa - Features 2 removable ottomans, letting you configure it as a cozy U-shaped sectional sofa or use the ottoman independently as a footrest, 3-seater couch, or additional seating. Rearrange freely to suit your space—perfect for living rooms, apartments, or bedrooms. Its practical flexibility and stylish design effortlessly enhance any ambiance, allowing you to craft a personalized setup with ease
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This modular sofa is known for its sturdiness and solidity, with a maximum weight capacity of 800 lbs. Additionally, the sofa couch features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Ergonomic & Comfortable - The spring cushions of this U-shaped sofa absorb the impact of daily use, preventing rapid wear and tear and extending the life of the sofa couch. Its 21-inch seat depth shines, providing ample support for both upright and reclining seating, while the matching 26.4-inch ottoman enhances relaxation by providing leg support or additional seating, which together ensure excellent lumbar support and pressure relief, making every moment of relaxation feel relaxed and luxurious
  • Durable Corduroy Fabric - This corduroy sofa couch has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The modern couch has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, sectional couch is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
  • Shipped in 3 Separate Packages - kindly allow for their arrival at different times. Slight color/size variations may occur due to displays/manual measurements. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Depth : 21 inches
  • Seat Height : 5.5 Inches
  • Weight Limit : 800 Pounds
  • Seating Capacity : 5.0
  • Product Dimensions : 57.9"D x 96.8"W x 35"H
  • Item Weight : 200.8 Pounds
  • Leg Length : 7.5 Inches
  • Type : Sectional